Pattullo Bridge Pattullo Bridge
Skip to navigation Skip to Contents Skip to Accessibility Statement
Home Active Transportation

Active Transportation Access

The stal̕əw̓asəm Bridge includes dedicated walking and cycling lanes, separated from traffic by a barrier on both sides of the bridge deck, and better connections to, from and near the bridge.

How to Cross the Fraser River

The multi-use path (MUP) on the west side of the stal̕əw̓asəm Bridge is open to pedestrians and cyclists for travel in both directions. The east MUP is temporarily closed to complete finishing works on the multi-use path and the East Columbia exit ramp.

The west MUP connects to the bridge from the Central Valley Greenway in New Westminster. Finishing work on the west MUP is ongoing, so please watch for crews and equipment when you are using that path and connections. Construction of the remaining MUP network (orange sections in the images below) continues.

Aerial view of the multi-use path on the east side of the stal̕əw̓asəm Bridge in New Westminster, showing routes for new and under-construction paths
Aerial view of the multi-use path on the east side of the stal̕əw̓asəm Bridge in New Westminster, showing routes for new and under-construction paths as well as temporary closure and detour.

The MUP on the west side of the stal̕əw̓asəm Bridge connects to King George Boulevard in Surrey, and existing bike routes in the area. The connections to Highway 17 and Bridge Road are expected to be completed later this year.

Aerial view of the multi-use path on the east side of the stal̕əw̓asəm Bridge in Surrey, showing routes for new and under-construction paths
Aerial view of the multi-use path on the east side of the stal̕əw̓asəm Bridge in Surrey, showing routes for new and under-construction paths as well as temporary closure and detour.