Pattullo Bridge Pattullo Bridge
Skip to navigation Skip to Contents Skip to Accessibility Statement
Home Active Transportation

Active Transportation Access

The stal̕əw̓asəm Bridge includes dedicated walking and cycling lanes, separated from traffic by a barrier on both sides of the bridge deck, and better connections to, from and near the bridge.

Access Maintained During 1-week Closture of Both Bridges

Pedestrian and cyclist access is being maintained on the sidewalk of the Pattullo Bridge during the one-week closure of the stal̕əw̓asəm Bridge and Pattullo Bridge.

Temporary Closure of Central Valley Greenway

A section of the Central Valley Greenway, between McBride Boulevard and Elliot Street in New Westminster, will be closed to pedestrians and cyclists for approximately 4-6 weeks. This access change is expected to start in late February 2026. Detour options are shown in the graphic below.

More information to come.